{"id":783,"date":"2019-11-14T10:52:36","date_gmt":"2019-11-14T09:52:36","guid":{"rendered":"https:\/\/innovativ-invest.com\/?post_type=projects&#038;p=783"},"modified":"2021-03-28T18:19:15","modified_gmt":"2021-03-28T16:19:15","slug":"wind-farm-north-01","status":"publish","type":"projects","link":"https:\/\/innovativ-invest.com\/en\/projects\/wind-farm-north-01\/","title":{"rendered":"Wind Farm North 01"},"content":{"rendered":"<div class=\"wp-bootstrap-blocks-row row\">\n\t\n\n<div class=\"col-12 col-sm-4 px-0 px-sm-3\">\n\t\t\t\n\n<figure class=\"wp-block-image\"><img decoding=\"async\" loading=\"lazy\" width=\"471\" height=\"545\" src=\"https:\/\/innovativ-invest.com\/wp-content\/uploads\/2019\/11\/wind_01.jpg\" alt=\"\" class=\"wp-image-683\" srcset=\"https:\/\/innovativ-invest.com\/wp-content\/uploads\/2019\/11\/wind_01.jpg 471w, https:\/\/innovativ-invest.com\/wp-content\/uploads\/2019\/11\/wind_01-259x300.jpg 259w\" sizes=\"(max-width: 471px) 100vw, 471px\" \/><\/figure>\n\n\t<\/div>\n\n\n\n<div class=\"col-12 col-sm-8 bg-grey-lighter py-5 p-sm-5\">\n\t\t\t\n\n<h3>Technical details:<\/h3>\n\n\n\n<figure class=\"wp-block-table\"><table><tbody><tr><td><strong>Project size:<\/strong><\/td><td>up to 127 MW<\/td><\/tr><tr><td><strong>Securing of land:<\/strong><\/td><td>is in testing<\/td><\/tr><tr><td><strong>Building application:<\/strong><\/td><td>is being prepared<\/td><\/tr><tr><td><strong>Environmental study:<\/strong><\/td><td>is being prepared<\/td><\/tr><tr><td><strong>Grant of construction permit is expected:<\/strong><\/td><td>11.2022<\/td><\/tr><tr><td><strong>Currently planned start of the project construction phase:<\/strong><\/td><td>09.2023<\/td><\/tr><tr><td><strong>Currently planned commissioning of the Wind farm:<\/strong><\/td><td>12.2024<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\t<\/div>\n\n<\/div>\n\n\n\n<h2 class=\"mt-6\">About the project<\/h2>\n\n\n\n<ul><li>up to max. 127 MW of power generation<\/li><li>is located east of Tangier<\/li><li>the ministry responsible for the plot there has reviewed the allocation of the planned plots for the wind turbines.<\/li><li>a grid connection point is envisaged about 22 km away at our own substation in the region, to be constructed specially <\/li><\/ul>\n\n\n\n<h2 class=\"mt-6 mb-5\">Gallery<\/h2>\n\n\n\n<figure class=\"is-layout-flex wp-block-gallery-1 wp-block-gallery columns-3 is-cropped\"><ul class=\"blocks-gallery-grid\"><li class=\"blocks-gallery-item\"><figure><a href=\"https:\/\/innovativ-invest.com\/wp-content\/uploads\/2019\/11\/20191003_142104-1024x768.jpg\"><img decoding=\"async\" loading=\"lazy\" width=\"1024\" height=\"768\" src=\"https:\/\/innovativ-invest.com\/wp-content\/uploads\/2019\/11\/20191003_142104-1024x768.jpg\" alt=\"\" data-id=\"688\" data-link=\"https:\/\/innovativ-invest.com\/?attachment_id=688\" class=\"wp-image-689\" srcset=\"https:\/\/innovativ-invest.com\/wp-content\/uploads\/2019\/11\/20191003_142104-1024x768.jpg 1024w, https:\/\/innovativ-invest.com\/wp-content\/uploads\/2019\/11\/20191003_142104-300x225.jpg 300w, https:\/\/innovativ-invest.com\/wp-content\/uploads\/2019\/11\/20191003_142104-768x576.jpg 768w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" \/><\/a><\/figure><\/li><li class=\"blocks-gallery-item\"><figure><a href=\"https:\/\/innovativ-invest.com\/wp-content\/uploads\/2019\/11\/20191003_142257-1024x498.jpg\"><img decoding=\"async\" loading=\"lazy\" width=\"1024\" height=\"498\" src=\"https:\/\/innovativ-invest.com\/wp-content\/uploads\/2019\/11\/20191003_142257-1024x498.jpg\" alt=\"\" data-id=\"691\" data-link=\"https:\/\/innovativ-invest.com\/?attachment_id=691\" class=\"wp-image-692\" srcset=\"https:\/\/innovativ-invest.com\/wp-content\/uploads\/2019\/11\/20191003_142257-1024x498.jpg 1024w, https:\/\/innovativ-invest.com\/wp-content\/uploads\/2019\/11\/20191003_142257-300x146.jpg 300w, https:\/\/innovativ-invest.com\/wp-content\/uploads\/2019\/11\/20191003_142257-768x373.jpg 768w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" \/><\/a><\/figure><\/li><li class=\"blocks-gallery-item\"><figure><a href=\"https:\/\/innovativ-invest.com\/wp-content\/uploads\/2019\/11\/20191003_151421-1024x498.jpg\"><img decoding=\"async\" loading=\"lazy\" width=\"1024\" height=\"498\" src=\"https:\/\/innovativ-invest.com\/wp-content\/uploads\/2019\/11\/20191003_151421-1024x498.jpg\" alt=\"\" data-id=\"694\" data-link=\"https:\/\/innovativ-invest.com\/?attachment_id=694\" class=\"wp-image-695\" srcset=\"https:\/\/innovativ-invest.com\/wp-content\/uploads\/2019\/11\/20191003_151421-1024x498.jpg 1024w, https:\/\/innovativ-invest.com\/wp-content\/uploads\/2019\/11\/20191003_151421-300x146.jpg 300w, https:\/\/innovativ-invest.com\/wp-content\/uploads\/2019\/11\/20191003_151421-768x373.jpg 768w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" \/><\/a><\/figure><\/li><\/ul><\/figure>\n\n\n\n<p><\/p>\n","protected":false},"featured_media":683,"template":"","acf":[],"_links":{"self":[{"href":"https:\/\/innovativ-invest.com\/en\/wp-json\/wp\/v2\/projects\/783"}],"collection":[{"href":"https:\/\/innovativ-invest.com\/en\/wp-json\/wp\/v2\/projects"}],"about":[{"href":"https:\/\/innovativ-invest.com\/en\/wp-json\/wp\/v2\/types\/projects"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/innovativ-invest.com\/en\/wp-json\/wp\/v2\/media\/683"}],"wp:attachment":[{"href":"https:\/\/innovativ-invest.com\/en\/wp-json\/wp\/v2\/media?parent=783"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}