{"id":784,"date":"2019-11-14T11:03:35","date_gmt":"2019-11-14T10:03:35","guid":{"rendered":"https:\/\/innovativ-invest.com\/?post_type=projects&#038;p=784"},"modified":"2021-03-28T18:11:37","modified_gmt":"2021-03-28T16:11:37","slug":"west-cap-02","status":"publish","type":"projects","link":"https:\/\/innovativ-invest.com\/en\/projects\/west-cap-02\/","title":{"rendered":"West Cap 02"},"content":{"rendered":"<div class=\"wp-bootstrap-blocks-row row\">\n\t\n\n<div class=\"col-12 col-sm-4 px-0 px-sm-3\">\n\t\t\t\n\n<figure class=\"wp-block-image\"><img decoding=\"async\" loading=\"lazy\" width=\"471\" height=\"545\" src=\"https:\/\/innovativ-invest.com\/wp-content\/uploads\/2019\/11\/wind_02.jpg\" alt=\"\" class=\"wp-image-679\" srcset=\"https:\/\/innovativ-invest.com\/wp-content\/uploads\/2019\/11\/wind_02.jpg 471w, https:\/\/innovativ-invest.com\/wp-content\/uploads\/2019\/11\/wind_02-259x300.jpg 259w\" sizes=\"(max-width: 471px) 100vw, 471px\" \/><\/figure>\n\n\t<\/div>\n\n\n\n<div class=\"col-12 col-sm-8 bg-grey-lighter py-5 p-sm-5\">\n\t\t\t\n\n<h3>Technical details<\/h3>\n\n\n\n<figure class=\"wp-block-table\"><table><tbody><tr><td><strong>Project size:<\/strong><\/td><td>up to 55 MW<\/td><\/tr><tr><td><strong>Securing of land:<\/strong><\/td><td>is largely completed<\/td><\/tr><tr><td><strong>Building application:<\/strong><\/td><td>has been submitted to the authorities<\/td><\/tr><tr><td><strong>Environmental study:&nbsp;<\/strong><\/td><td>is being prepared<\/td><\/tr><tr><td><strong>Grant of construction permit is expected:&nbsp;<\/strong><\/td><td>06.2022<\/td><\/tr><tr><td><strong>Currently planned start of the project construction phase:<br> <br><\/strong><\/td><td>06.2023<\/td><\/tr><tr><td><strong>Currently planned commissioning of the  Wind farm:<\/strong><\/td><td>06.2024<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\t<\/div>\n\n<\/div>\n\n\n\n<h2 class=\"mt-6\">About the project<\/h2>\n\n\n\n<ul><li>up to max. 55 MW of power generation<\/li><li>is located south of Casablanca<\/li><li>the local municipalities have approved allocation of the planned wind turbine plot area<\/li><li>a grid connection point is envisaged about 15 km away on a collective line for several wind farm projects in the region <\/li><\/ul>\n","protected":false},"featured_media":679,"template":"","acf":[],"_links":{"self":[{"href":"https:\/\/innovativ-invest.com\/en\/wp-json\/wp\/v2\/projects\/784"}],"collection":[{"href":"https:\/\/innovativ-invest.com\/en\/wp-json\/wp\/v2\/projects"}],"about":[{"href":"https:\/\/innovativ-invest.com\/en\/wp-json\/wp\/v2\/types\/projects"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/innovativ-invest.com\/en\/wp-json\/wp\/v2\/media\/679"}],"wp:attachment":[{"href":"https:\/\/innovativ-invest.com\/en\/wp-json\/wp\/v2\/media?parent=784"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}