{"id":786,"date":"2019-11-14T11:08:20","date_gmt":"2019-11-14T10:08:20","guid":{"rendered":"https:\/\/innovativ-invest.com\/?post_type=projects&#038;p=786"},"modified":"2021-03-28T18:02:10","modified_gmt":"2021-03-28T16:02:10","slug":"pv-projekt-03","status":"publish","type":"projects","link":"https:\/\/innovativ-invest.com\/en\/projects\/pv-projekt-03\/","title":{"rendered":"PV Projekt 03"},"content":{"rendered":"<div class=\"wp-bootstrap-blocks-row row\">\n\t\n\n<div class=\"col-12 col-sm-4 px-0 px-sm-3\">\n\t\t\t\n\n<figure class=\"wp-block-image\"><img decoding=\"async\" loading=\"lazy\" width=\"471\" height=\"545\" src=\"https:\/\/innovativ-invest.com\/wp-content\/uploads\/2019\/11\/pv_3.jpg\" alt=\"\" class=\"wp-image-642\" srcset=\"https:\/\/innovativ-invest.com\/wp-content\/uploads\/2019\/11\/pv_3.jpg 471w, https:\/\/innovativ-invest.com\/wp-content\/uploads\/2019\/11\/pv_3-259x300.jpg 259w\" sizes=\"(max-width: 471px) 100vw, 471px\" \/><\/figure>\n\n\t<\/div>\n\n\n\n<div class=\"col-12 col-sm-8 bg-grey-lighter py-5 p-sm-5\">\n\t\t\t\n\n<h3>Technical details<\/h3>\n\n\n\n<figure class=\"wp-block-table\"><table><tbody><tr><td><strong>Project size:<\/strong><\/td><td>up to 140 MW<\/td><\/tr><tr><td><strong>Securing of land:<\/strong><\/td><td>is largely completed<\/td><\/tr><tr><td><strong>Building application:<\/strong><\/td><td>has been submitted to the authorities<\/td><\/tr><tr><td><strong>Environmental study:&nbsp;&nbsp;<\/strong><\/td><td>is being drawn up<\/td><\/tr><tr><td><strong>Grant of construction permit is expected:&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;<\/strong><\/td><td>04.2022<\/td><\/tr><tr><td><strong>Currently planned start of the project construction phase:<\/strong><\/td><td>01.2023<\/td><\/tr><tr><td><strong>Currently planned commissioning of the PV plant:<\/strong><\/td><td>02.2024<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\t<\/div>\n\n<\/div>\n\n\n\n<h2 class=\"mt-6\">About the project<\/h2>\n\n\n\n<ul><li>up to max. 140 MW of power generation<\/li><li>is located northwest of Marrakech<\/li><li>the local municipalities and agricultural cooperatives have approved allocation of the planned PV plot area<\/li><li>a grid connection point is envisaged about 5 km away <\/li><\/ul>\n\n\n\n<h2 class=\"mt-6 mb-5\">Gallery<\/h2>\n\n\n\n<figure class=\"is-layout-flex wp-block-gallery-1 wp-block-gallery columns-3 is-cropped\"><ul class=\"blocks-gallery-grid\"><li class=\"blocks-gallery-item\"><figure><a href=\"https:\/\/innovativ-invest.com\/wp-content\/uploads\/2019\/11\/DSC09057-1024x768.jpg\"><img decoding=\"async\" loading=\"lazy\" width=\"1024\" height=\"768\" src=\"https:\/\/innovativ-invest.com\/wp-content\/uploads\/2019\/11\/DSC09057-1024x768.jpg\" alt=\"\" data-id=\"644\" data-link=\"https:\/\/innovativ-invest.com\/projects\/pv-projekt-03\/dsc09057\/\" class=\"wp-image-645\" srcset=\"https:\/\/innovativ-invest.com\/wp-content\/uploads\/2019\/11\/DSC09057-1024x768.jpg 1024w, https:\/\/innovativ-invest.com\/wp-content\/uploads\/2019\/11\/DSC09057-300x225.jpg 300w, https:\/\/innovativ-invest.com\/wp-content\/uploads\/2019\/11\/DSC09057-768x576.jpg 768w, https:\/\/innovativ-invest.com\/wp-content\/uploads\/2019\/11\/DSC09057.jpg 2000w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" \/><\/a><\/figure><\/li><li class=\"blocks-gallery-item\"><figure><a href=\"https:\/\/innovativ-invest.com\/wp-content\/uploads\/2019\/11\/DSC09058_b-1024x792.jpg\"><img decoding=\"async\" loading=\"lazy\" width=\"1024\" height=\"792\" src=\"https:\/\/innovativ-invest.com\/wp-content\/uploads\/2019\/11\/DSC09058_b-1024x792.jpg\" alt=\"\" data-id=\"647\" data-link=\"https:\/\/innovativ-invest.com\/projects\/pv-projekt-03\/dsc09058_b\/\" class=\"wp-image-648\" srcset=\"https:\/\/innovativ-invest.com\/wp-content\/uploads\/2019\/11\/DSC09058_b-1024x792.jpg 1024w, https:\/\/innovativ-invest.com\/wp-content\/uploads\/2019\/11\/DSC09058_b-300x232.jpg 300w, https:\/\/innovativ-invest.com\/wp-content\/uploads\/2019\/11\/DSC09058_b-768x594.jpg 768w, https:\/\/innovativ-invest.com\/wp-content\/uploads\/2019\/11\/DSC09058_b.jpg 2000w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" \/><\/a><\/figure><\/li><li class=\"blocks-gallery-item\"><figure><a href=\"https:\/\/innovativ-invest.com\/wp-content\/uploads\/2019\/11\/DSC09066-1024x768.jpg\"><img decoding=\"async\" loading=\"lazy\" width=\"1024\" height=\"768\" src=\"https:\/\/innovativ-invest.com\/wp-content\/uploads\/2019\/11\/DSC09066-1024x768.jpg\" alt=\"\" data-id=\"650\" data-link=\"https:\/\/innovativ-invest.com\/projects\/pv-projekt-03\/dsc09066\/\" class=\"wp-image-651\" srcset=\"https:\/\/innovativ-invest.com\/wp-content\/uploads\/2019\/11\/DSC09066-1024x768.jpg 1024w, https:\/\/innovativ-invest.com\/wp-content\/uploads\/2019\/11\/DSC09066-300x225.jpg 300w, https:\/\/innovativ-invest.com\/wp-content\/uploads\/2019\/11\/DSC09066-768x576.jpg 768w, https:\/\/innovativ-invest.com\/wp-content\/uploads\/2019\/11\/DSC09066.jpg 2000w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" \/><\/a><\/figure><\/li><li class=\"blocks-gallery-item\"><figure><a href=\"https:\/\/innovativ-invest.com\/wp-content\/uploads\/2019\/11\/DSC09067-1024x768.jpg\"><img decoding=\"async\" loading=\"lazy\" width=\"1024\" height=\"768\" src=\"https:\/\/innovativ-invest.com\/wp-content\/uploads\/2019\/11\/DSC09067-1024x768.jpg\" alt=\"\" data-id=\"653\" data-link=\"https:\/\/innovativ-invest.com\/projects\/pv-projekt-03\/dsc09067\/\" class=\"wp-image-654\" srcset=\"https:\/\/innovativ-invest.com\/wp-content\/uploads\/2019\/11\/DSC09067-1024x768.jpg 1024w, https:\/\/innovativ-invest.com\/wp-content\/uploads\/2019\/11\/DSC09067-300x225.jpg 300w, https:\/\/innovativ-invest.com\/wp-content\/uploads\/2019\/11\/DSC09067-768x576.jpg 768w, https:\/\/innovativ-invest.com\/wp-content\/uploads\/2019\/11\/DSC09067.jpg 2000w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" \/><\/a><\/figure><\/li><li class=\"blocks-gallery-item\"><figure><a href=\"https:\/\/innovativ-invest.com\/wp-content\/uploads\/2019\/11\/DSC09068-1024x768.jpg\"><img decoding=\"async\" loading=\"lazy\" width=\"1024\" height=\"768\" src=\"https:\/\/innovativ-invest.com\/wp-content\/uploads\/2019\/11\/DSC09068-1024x768.jpg\" alt=\"\" data-id=\"656\" data-link=\"https:\/\/innovativ-invest.com\/projects\/pv-projekt-03\/dsc09068\/\" class=\"wp-image-657\" srcset=\"https:\/\/innovativ-invest.com\/wp-content\/uploads\/2019\/11\/DSC09068-1024x768.jpg 1024w, https:\/\/innovativ-invest.com\/wp-content\/uploads\/2019\/11\/DSC09068-300x225.jpg 300w, https:\/\/innovativ-invest.com\/wp-content\/uploads\/2019\/11\/DSC09068-768x576.jpg 768w, https:\/\/innovativ-invest.com\/wp-content\/uploads\/2019\/11\/DSC09068.jpg 2000w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" \/><\/a><\/figure><\/li><li class=\"blocks-gallery-item\"><figure><a href=\"https:\/\/innovativ-invest.com\/wp-content\/uploads\/2019\/11\/DSC09072-1024x768.jpg\"><img decoding=\"async\" loading=\"lazy\" width=\"1024\" height=\"768\" src=\"https:\/\/innovativ-invest.com\/wp-content\/uploads\/2019\/11\/DSC09072-1024x768.jpg\" alt=\"\" data-id=\"659\" data-link=\"https:\/\/innovativ-invest.com\/projects\/pv-projekt-03\/dsc09072\/\" class=\"wp-image-660\" srcset=\"https:\/\/innovativ-invest.com\/wp-content\/uploads\/2019\/11\/DSC09072-1024x768.jpg 1024w, https:\/\/innovativ-invest.com\/wp-content\/uploads\/2019\/11\/DSC09072-300x225.jpg 300w, https:\/\/innovativ-invest.com\/wp-content\/uploads\/2019\/11\/DSC09072-768x576.jpg 768w, https:\/\/innovativ-invest.com\/wp-content\/uploads\/2019\/11\/DSC09072.jpg 2000w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" \/><\/a><\/figure><\/li><li class=\"blocks-gallery-item\"><figure><a href=\"https:\/\/innovativ-invest.com\/wp-content\/uploads\/2019\/11\/IMG-20180217-WA0011-1024x768.jpg\"><img decoding=\"async\" loading=\"lazy\" width=\"1024\" height=\"768\" src=\"https:\/\/innovativ-invest.com\/wp-content\/uploads\/2019\/11\/IMG-20180217-WA0011-1024x768.jpg\" alt=\"\" data-id=\"662\" data-link=\"https:\/\/innovativ-invest.com\/projects\/pv-projekt-03\/img-20180217-wa0011\/\" class=\"wp-image-663\" srcset=\"https:\/\/innovativ-invest.com\/wp-content\/uploads\/2019\/11\/IMG-20180217-WA0011-1024x768.jpg 1024w, https:\/\/innovativ-invest.com\/wp-content\/uploads\/2019\/11\/IMG-20180217-WA0011-300x225.jpg 300w, https:\/\/innovativ-invest.com\/wp-content\/uploads\/2019\/11\/IMG-20180217-WA0011-768x576.jpg 768w, https:\/\/innovativ-invest.com\/wp-content\/uploads\/2019\/11\/IMG-20180217-WA0011.jpg 2000w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" \/><\/a><\/figure><\/li><\/ul><\/figure>\n","protected":false},"featured_media":642,"template":"","acf":[],"_links":{"self":[{"href":"https:\/\/innovativ-invest.com\/en\/wp-json\/wp\/v2\/projects\/786"}],"collection":[{"href":"https:\/\/innovativ-invest.com\/en\/wp-json\/wp\/v2\/projects"}],"about":[{"href":"https:\/\/innovativ-invest.com\/en\/wp-json\/wp\/v2\/types\/projects"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/innovativ-invest.com\/en\/wp-json\/wp\/v2\/media\/642"}],"wp:attachment":[{"href":"https:\/\/innovativ-invest.com\/en\/wp-json\/wp\/v2\/media?parent=786"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}